← Corpus / fullstack-vc / narrative

Track 3 · Offer to LPs

Path
narratives/2026-05-27_monthly-all-hands/09-track-offer-to-lps.md

What this slide is

Detail card for Track 3. The wall: LPs operate on a slower clock than the deal allows; you have to translate and prime.

Why it’s here

Audience members with active LPs hungry for direct exposure self-select here. This is the track most aligned with the LP-syndication pulse from slide 05b.

What to surface

  • The hook quote
  • The reality — LP clock vs. deal clock mismatch
  • 1-2 agent hints
  • “3/3” cycle indicator
  • Optional callback line: “remember the conundrum a few slides ago”

Visual hierarchy suggestion

Same shape as Tracks 1 and 2. Could subtly emphasize this track since the pulse data on slide 05b already showed LPs are demanding here — a small visual echo of the pulse colors.